Rooflight and skylight installation in Shrub End
Inter-war and post-war housing south west of the town, with a lot of shallow pitched roofs.
Rooflights we install in Shrub End
Every job is surveyed first. The right unit depends on the roof you have, not on what we would rather sell.
Roof Lantern Installation
Read more
Flat Roof Rooflight Installation
Read more
Roof Window Installation
Read more
VELUX Window Installation
Read more
Electric and Opening Rooflights
Read more
Energy Efficient Rooflights
Read more
Replacing a Failed or Misted Rooflight
Read more
Walk-On Rooflight Installation
Read more
Conservation Rooflight Installation
Read more
Sun Tunnel Installation
Read more
Shrub End runs south west from the town centre, a mix of inter-war semis and post-war housing with a scattering of newer infill.
Pitch decides the product

A good deal of the post-war stock here has a shallow roof pitch, and pitch decides which product is even possible. Most roof windows are made for pitches from about fifteen degrees upwards. Below that a roof window is the wrong answer and a rooflight on a kerb is the right one, because a kerb creates the fall the roof does not have.
This is worth establishing before anyone gets attached to an idea. It is a five minute check at survey and it saves specifying a product that cannot be fitted.
Extensions and lanterns

Rear extensions are common and mostly flat roofed. Where the extension is wide and the room is intended as the main living space, a roof lantern is worth the extra over a flat unit, though it brings a structural conversation with it: a wide opening usually means a steel, and the steel has to be designed before the lantern is ordered because it sets the kerb position.
Replacements

Older rooflights on this stock are often domed polycarbonate, fitted in the 1980s and 1990s. They yellow, they craze and they leak at the fixings eventually. Replacing a dome with a flush glazed unit is one of the most visible improvements available for the money, and it is covered on the replacement page.
Skylight and rooflight work we cover in Shrub End

Roof lanterns, flat roof rooflights, roof windows, VELUX replacements, conservation units and sun tunnels, all surveyed before they are quoted. We also work in Prettygate, Stanway, Berechurch.
Hipped roofs, and the slope you actually have

A great deal of Shrub End is interwar and immediate post war semi detached and detached housing, and a large proportion of it is hipped rather than gabled. That single detail changes what is possible in the roof, and it is the first thing we look at.
A gabled roof has two large rectangular slopes running the full length of the house, with a solid brick wall at each end. There is a lot of usable slope and it is all the same shape.
A hipped roof slopes on all four sides. The two main slopes are trapezoidal rather than rectangular, cut back at both ends by the hips, and the two end slopes are triangles. The consequences for a rooflight are direct.
What hips take away
Usable slope area. The corners of the main slopes are gone, so a wide unit or a run of several units has less room than the roof appears to offer from the ground.
Head height in the loft. A hipped roof loses volume at both ends, and it is exactly the volume where a loft conversion would put the useful floor area. Hipped lofts convert to smaller rooms than gabled ones of the same footprint, which is why hip to gable conversions exist and why they cost what they do.
Structural freedom. The hip rafters at each corner are structural members carrying the corner of the roof, and there is no cutting into them. An opening has to sit clear.
None of that prevents a skylight installation. It means the position is decided by the structure rather than by preference, and a survey is genuinely necessary here rather than a formality.
What hips give back
Orientation choice. A gabled house facing north to south has slopes facing only east and west. A hipped house of the same orientation has some slope facing every direction.
That matters more than people expect. North facing slope gives even, cool, glare free light all day with no solar gain at all, which is the best light in any building for a kitchen work surface, a study or a studio. Specify it for thermal performance alone and spend nothing on solar control. A south or west facing slope wants solar control glass as standard and, on a large unit, thought about shading.
On a hipped roof you frequently have the luxury of choosing, and that is worth using rather than defaulting to whichever slope faces the garden.
Rooflight or dormer
The question that comes up on every Shrub End loft conversion.
A rooflight sits in the plane of the slope, needs no planning permission in most cases, costs a fraction as much, and gives better light per pound because it faces the sky rather than the horizon.
A dormer adds standing headroom and floor area, gives a conventional window and a view out at eye level, and is much more expensive. On a hipped roof it may also require planning permission depending on size and position, where a rooflight generally does not.
The honest answer is usually both, in that order: rooflights for daylight across the room, and a dormer only where floor area with standing height is genuinely needed. A conversion lit entirely by dormers is an expensive way to get a dark room.
Coverings
Clay plain tiles on the older interwar properties, concrete interlocking tiles on the post war ones, and a fair number reroofed in the last thirty years in something different again from the original.
The flashing kit follows the covering and it is not interchangeable. Ask any quoting installer which kit is specified for your covering by name, because a universal kit on a profiled tile is where cheap quotations save money and where installations leak.
Old clay plain tiles are brittle and a proportion will break on removal however careful the work. Matching weathered clay is difficult, and the usual answer is to take sound tiles from a hidden slope and put the new ones there.
Access
Generally good. Most Shrub End properties have driveways or front gardens with space for a tower, and semi detached layouts usually allow side access to the rear. Two storey rear slope work will normally need scaffold, but it can stand on private land, which avoids the licence and the cost that comes with pavement scaffold elsewhere in Colchester.
| Local factor | In Shrub End |
|---|---|
| Planning authority | Colchester City Council |
| Conservation position | None |
| Typical roof covering | Concrete interlocking tile with clay plain tile on the older stock |
| Roof structure | Mixed cut roofs and trussed rafters |
| Exposure | Inland, standard coatings |
| Most common job here | Replacement units and new flat roof openings |
Water on the inside, and what it actually is

The interwar and post war houses in Shrub End have been insulated, draught proofed and double glazed over the decades without gaining any ventilation strategy along the way. They hold moisture, and moisture condenses on whatever surface is coldest.
In a room with a rooflight, that is very often the glass or the plaster around it. Water forms, it runs, and it gets reported to us as a leak. A good proportion of our callouts here turn out to be nothing of the kind.
Telling them apart
It takes a minute and it saves a visit.
Condensation shows up on cold mornings, is worst in the depths of winter, forms evenly across the inner face of the glass, and bears no relation to whether it has rained. It clears as the day warms up.
A leak follows rain, and usually follows a particular kind of rain, driven from one direction. It arrives at one point rather than spread evenly. It leaves a mark that is still there when everything has dried.
Misting inside the sealed unit is neither. If the moisture is between the two panes and cannot be wiped off either face, the perimeter seal has failed. That is a unit at the end of its life rather than an installation problem, and it happens at fifteen to twenty five years.
There is one case where water on the inside genuinely does mean a fault. If it is forming on the reveal, the plastered surround, rather than on the glass, the usual cause is a missing insulation collar. The collar closes the gap between frame and structure, and without it the reveal is cold enough to condense. It is a separate order line on any quotation, it is the first thing dropped from a cheap one, and the symptom appears months later.
Ventilation is the actual fix
Where condensation is the diagnosis, no amount of work on the window solves it. What solves it is moving air.
An opening at the highest point of a room lets warm moist air leave, and as it goes it pulls drier air in through anything open lower down. That is stack ventilation and it clears a room in minutes where a wall window alone takes hours. It only works if something at low level is open too: a rooflight on its own in a sealed room moves very little.
In a hipped roof house the rooflight is often high and awkward to reach, which is the practical case for a motorised opener with a rain sensor. A window that closes itself when it starts raining is a window that actually gets left open. Where running mains cable through a finished ceiling would mean lifting floors and chasing walls, a solar powered opener needs no connection at all and goes in within a couple of hours.
Choosing the glass
Two numbers get quoted and they describe the same product differently, which is where quotation comparison goes wrong.
Centre pane U-value measures the glass away from the edges and ignores the spacer and frame, which is exactly where heat escapes. It is always the better figure and it is what marketing quotes.
Whole unit includes glass, spacer and frame weighted by area. It is what the building experiences and what Building Regulations use. It is always worse, frequently by 0.4 or more.
A rooflight advertised at 1.0 and another at 1.4 may well be identical performance described two ways. Ask both installers for whole unit figures or you are comparing nothing.
Beyond that, specify by orientation. Solar control on south and west facing slopes, nothing extra on north, and a warm edge spacer throughout, because an aluminium spacer shows as a band of condensation around the edge of the glass on cold mornings and gets mistaken for a failed unit.
Working around the hip

Because the position of a rooflight on a hipped roof is dictated by structure rather than preference, a survey here does something a survey elsewhere does not: it establishes where the unit can go before anyone discusses what it should be.
The hip rafter at each corner carries the corner of the roof and nothing is cut into it. Any opening sits clear of it, which on a modest Shrub End semi means the usable slope is narrower than the roof looks from the pavement.
What we do is measure the clear span between structural members from inside the loft, then work backward to the unit sizes that fit. That usually produces two or three real options rather than a free choice, and it is a better conversation than starting from a catalogue.
Where a wider opening is genuinely wanted, a trimmer can be designed to carry the load around it. That is routine, it needs an engineer rather than a judgement, and it is the point at which the price steps up. It is worth knowing that before setting a budget rather than after receiving a quotation.
The other thing a survey settles is which slope. A hipped roof faces every direction, so you frequently have a genuine choice between a north facing slope giving even glare free light with no solar gain, and a south or west slope that needs solar control glass. Choosing on structure alone and discovering the orientation afterwards is how rooms end up too hot.
Access here
Generally good. Most properties have a driveway or front garden with room for a tower, and semi detached layouts usually allow side access to the rear. Two storey rear slope work needs scaffold, but it stands on private land, which avoids the highway licence and the cost that comes with pavement scaffold in the older parts of Colchester.
Timescales and working around you

A like for like replacement into a sound opening is a single day. A new opening in a tiled roof with making good runs to three or four days depending on the plastering.
Most of that is inside rather than on the roof, which is why the protection matters: floors covered, furniture moved or sheeted, and a dust barrier at the door of the room. The making good produces the mess, not the roof work.
What lengthens a programme is the order rather than the work. Stock sizes are quick; made to measure units run to several weeks. Where a hipped roof forces an unusual width, made to measure is more likely than elsewhere, so it is worth establishing at survey and planning around rather than discovering later.
We book the fitting to the delivery date rather than to an optimistic estimate, because a date you can plan around is worth more than one that moves.
Asked by people in Shrub End
What roofs are common in Shrub End?
A mix. Inter-war semis with plain clay tile or concrete, post-war housing on trussed rafters, and newer infill. The inter-war stock frequently has a traditional cut roof with a purlin, which constrains where an opening can go more than the newer housing does.
Do I need building regulations approval?
Forming an opening in a roof is notifiable work, and so is replacing a rooflight, which is a controlled fitting. Either it goes through building control or the installer self-certifies under a competent person scheme and issues you a certificate. That certificate surfaces at sale, so make sure it reaches you.
How much disruption is there inside?
The room below is cleared and sheeted before anything is cut, because a rooflight opening rains debris the moment the ceiling is opened. The reveal is replastered afterwards and fresh plaster needs to dry before decoration, so the room is usable but not finished on the day.
Can you do several rooflights in one visit?
It is much better value. Access is frequently the largest single line on a small job and it costs nearly the same for one unit as for four, so doing them together spreads it. It also means one period of dust and one decorating job rather than three.
More areas we cover
Ready to bring the daylight in?
Tell us about your project and we’ll send a clear, fixed written quote, no pressure, no surprises.
- Fixed written price before any work starts
- No pressure, no obligation, no sales calls
- Flexible survey times that suit you
- A reply within one working day