Rooflight and skylight installation in Myland
Mixed older village stock and large modern development north of the town.
Rooflights we install in Myland
Every job is surveyed first. The right unit depends on the roof you have, not on what we would rather sell.
Roof Lantern Installation
Read more
Flat Roof Rooflight Installation
Read more
Roof Window Installation
Read more
VELUX Window Installation
Read more
Electric and Opening Rooflights
Read more
Energy Efficient Rooflights
Read more
Replacing a Failed or Misted Rooflight
Read more
Walk-On Rooflight Installation
Read more
Conservation Rooflight Installation
Read more
Sun Tunnel Installation
Read more
Myland covers the older village around the church and the substantial modern development that has grown north of it. The two halves need different answers, which is a small version of the pattern across the whole borough.
The older core

Plain clay tile and slate on the older houses, traditional cut roofs, and generous roof voids. Rafters can be cut and trimmed here without a structural redesign, which makes a wider roof window or a proper loft conversion straightforward.
The new development

Trussed roofs, profiled concrete tiles, and the constraints that come with both. Between the trusses a standard roof window fits with no structural work at all; across them it is an engineering job.
What most people here actually want

More light in a kitchen at the back of the house. On the newer stock that is usually a flat roof extension with two rooflights, or where the room is the main living space, a roof lantern. On the older stock it is more often a pair of roof windows into an existing pitched roof.
Skylight and rooflight work we cover in Myland

Roof lanterns, flat roof rooflights, roof windows, VELUX replacements, conservation units and sun tunnels, all surveyed before they are quoted. We also work in Mile End, Highwoods, Braiswick.
New build roofs on the northern edge

Myland has absorbed more new housing than any other part of Colchester in the last twenty years, and the roofs reflect it. Alongside the older properties around the church and Mile End Road sits a very large amount of estate building, and on that housing the roof structure is essentially uniform.
Trussed rafters, shallow pitches, profiled interlocking tiles, and a warranty period that may still be running.
What a trussed roof allows
The trusses sit at 600mm centres and each one is an engineered unit in which rafter, ceiling tie and webs work together. A rooflight narrow enough to sit between two of them, touching neither, goes in with no structural work at all. That is the straightforward job and it is what most Myland enquiries turn into.
Anything wider means cutting a truss member, which changes how the roof carries load, and it needs a structural trimmer designed by an engineer rather than judged by a fitter. It is routine work and it is the point at which the quotation steps up. Knowing that before setting a budget avoids an unpleasant surprise.
It also means the loft is not convertible in the ordinary sense. Webs cross the middle of the space, and clearing them means replacing the roof structure rather than boarding it out. On these estates, daylight work happens in extensions rather than in the main roof.
Warranties and covenants
Two things specific to new build, and both are simple to deal with if they are checked first.
The structural warranty. Where a property is still inside its cover period, forming a new opening in the roof can affect it. That is not a reason to avoid the work. It is a reason to check the terms and to keep documentation showing the installation was carried out to the manufacturer’s instructions. We provide a written specification naming the unit, the flashing kit and the detailing, plus a ten year guarantee on the workmanship, which is what a warranty provider asks for if the question arises.
Covenants in the deeds. Developers frequently restrict alterations to elevations facing the street. These are private contractual restrictions rather than planning ones, they are enforceable, and they are much easier to read before the work than to argue about after.
Planning itself is usually straightforward. There is no conservation designation over the modern estates, so permitted development normally applies: a rooflight is permitted provided it projects no more than 150mm beyond the plane of the roof and does not sit above the highest part of it.
Shallow pitch, and getting the light in
Pitches here run between 25 and 30 degrees, which is comfortably above any manufacturer’s minimum but shallow enough to change two things.
Water sheds more slowly, so more of the weathering job falls on the flashing kit. The correct deep profile kit for an interlocking tile is essential rather than preferable, and substituting a flat kit intended for slate leaves voids under the tile profile that water finds within a season. It is the most common fault we find on other people’s work and it is invisible once the job is finished.
The reveal is longer and shallower, which blocks a surprising amount of the light the window collects. Splaying it, cutting back at an angle at head and sill rather than boxing it square, opens the beam and makes a modest unit feel much larger. It costs a little more in plastering and it is the best value decision available on a roof of this pitch.
The older core
Around the church and the older stretches of Mile End Road the picture is different: traditional cut roofs with rafters and purlins, steeper pitches, and coverings including slate and clay plain tile.
Cut roofs give real freedom. Openings can be formed or widened with ordinary carpentry, wide rooflights are possible, and lofts convert properly. The trade off is age: more variable timber, less predictable underlay, and a genuine possibility of decay around an old opening. Any honest quotation on a property of that age names a contingency rather than pretending it cannot happen.
There are listed buildings in the older part of the parish. A listing removes permitted development entirely and listed building consent is required for a rooflight on any slope regardless of visibility.
Access
Excellent on the new estates. Off street parking, wide roads, open frontages and space to stand a tower at the rear. Most single storey extension work needs no scaffold at all, which keeps the price noticeably below the terraced parts of town.
Tighter around the older core, where parking is limited and side access is not guaranteed.
What to send us
A photograph of the roof, one looking up inside the loft, and for an extension one showing where the flat roof meets the house. The loft photograph settles cut against trussed, which is the question that decides the price.
| Local factor | In Myland |
|---|---|
| Planning authority | Colchester City Council |
| Conservation position | Conservation interest around the old village core |
| Typical roof covering | Concrete interlocking tile |
| Roof structure | Trussed rafters |
| Exposure | Inland, standard coatings |
| Most common job here | Flat roof rooflights |
Extensions, which is where the work is

Because the trussed roofs on the Myland estates are not convertible without replacing the structure, almost all the daylight work here happens over rear extensions. That makes the kerb the most important detail on the job.
A rooflight bedded straight onto a flat deck sits in whatever water the roof holds, and every flat roof holds some. What makes the difference between a twenty five year installation and a problem in three winters is an upstand of at least 150mm, a deck that falls away from it, and rigid insulation on the outer face of the kerb itself.
The insulation is the item nobody mentions. A 1200 by 1800 rooflight has six metres of perimeter, and an uninsulated timber kerb punching through the roof insulation presents close to a square metre of poorly performing envelope at a U-value several times worse than the glass sitting on it. That is not a rounding error, it is comparable to leaving a patch of the roof uninsulated. It costs a sheet of board and an hour, and it vanishes under the covering, which is exactly why it gets skipped.
When you compare quotations, ask directly whether the kerb is insulated. It is the quickest way to tell who is detailing the job and who is fitting a unit.
Flat rooflights or a lantern
On a modest kitchen extension, two or three flat roof rooflights in a row light a long room more evenly than one large unit ever will, cost less, and sit lower from outside.
On a larger extension with a flat ceiling and normal head height, a lantern gives volume the room does not otherwise have, and collects light from more than one direction so it stays bright as the sun moves round rather than having one good hour. It needs the structure below to carry it and it can look out of proportion on a small extension.
Sizing and overheating
Glazed area somewhere around 15 to 20 percent of floor area gives a bright room without turning it into a greenhouse. The common mistake is jumping straight to the largest unit that fits.
A great many Myland rear elevations face south or west, and a large rooflight on those orientations without solar control glass produces a room that is unusable on a July afternoon. The glass costs a modest premium at the point of order and a great deal to change afterwards, because the labour and access are identical either way.
The second half of the answer is an opening at the highest point so accumulated heat can leave. On a motorised unit with a rain sensor, night purge happens without anyone thinking about it.
Maintenance
Keep the perimeter clear. Leaves and silt collect around a kerb, water sits against the seal, and standing water is what kills a flat roof unit early. Check the outlet the roof drains to, because a perfect fall discharging into a blocked gulley is a pond. Clean the gasket on any opening unit once a year, since grit on a compression seal stops the sash seating and gets reported as a leak.
Choosing the glass

Two numbers get quoted for the same product and that is where quotation comparison goes wrong.
Centre pane U-value measures the glass away from the edges and ignores the spacer and the frame, which is exactly where heat escapes. It is always the better figure and it is what marketing quotes.
Whole unit includes glass, spacer and frame weighted by area. It is what the building actually experiences and what Building Regulations use, and it is always worse, frequently by 0.4 or more.
A rooflight advertised at 1.0 and another at 1.4 may be identical performance described two ways. Ask both installers for whole unit figures or you are comparing nothing.
Beyond the headline number, two things matter more than most people expect. A warm edge spacer rather than aluminium, because an aluminium bar conducts heat around the whole perimeter of every pane and shows as a band of condensation at the edge of the glass on cold mornings, which regularly gets mistaken for a failed unit. And solar control on south and west facing units, which is not an optional extra on a modern airtight house with a glazed extension.
Triple glazing we would generally advise against. It takes the whole unit figure from about 1.2 to about 0.8, which is real and modest. It is heavier, which affects the actuator on an opening unit. It transmits noticeably less daylight, which works against the reason you fitted a rooflight. The same money spent on solar control glass and an insulated kerb does more for how the room feels.
Timescales and working around you

A like for like replacement into a sound opening is a single day. A new opening with making good is three to four days depending on the plastering. Flat roof rooflights over an extension depend on whether the kerb already exists and is correct.
What lengthens a programme is the order rather than the work. Stock sizes are quick; made to measure units and lanterns run to several weeks. Where a trussed roof means a designed trimmer is needed, the engineer’s drawing has to come before the order.
On newer property there are two additional checks that take days rather than weeks and are much easier before than after: the deeds, for covenants restricting alterations to street facing elevations, and the structural warranty terms.
We book the fitting to the delivery date rather than to an optimistic estimate. Most of the work is inside rather than on the roof, so floors are covered, furniture sheeted and a dust barrier put at the door before anything else happens.
Asked by people in Myland
Is Myland's older core protected?
The area around the church has historic character and protection; the large modern development north of it does not. Which half you are in decides whether an application is needed for a front-facing unit, so it is worth confirming the address with the council.
What is the usual job on the newer Myland housing?
Trussed rafters, concrete interlocking tile, deep profile flashing, and a unit sized between two trusses so nothing structural is needed. On a kitchen extension at the back, a flat rooflight or a lantern on an insulated kerb.
Can I have a lantern on a rear extension here?
Commonly, and the two things worth settling first are the roof build-up and the fall. Most extensions of this age are warm roofs, which is the straightforward case. The kerb must be insulated on its outer face or its internal face runs cold and produces condensation that gets reported as a leak every winter.
How long is the lead time?
A stock size roof window arrives in days. A lantern is made to your kerb dimensions and runs to several weeks, so the sequence is structural design, kerb built, survey to the finished kerb, then order. Booking the fitting first and hoping the unit arrives is how jobs slip.
More areas we cover
Ready to bring the daylight in?
Tell us about your project and we’ll send a clear, fixed written quote, no pressure, no surprises.
- Fixed written price before any work starts
- No pressure, no obligation, no sales calls
- Flexible survey times that suit you
- A reply within one working day