Mersea and the Blackwater

Rooflight and skylight installation in West Mersea

An island town reached by a tidal causeway, with full salt exposure and a lot of self-built stock.

West Mersea and the villages around it Skylight specialists only Free, fixed written quotes
Rooflight installation on a house in West Mersea
10 years workmanship guarantee
Skylight & rooflight specialists Fixed written quotes Watertight workmanship Building Control notified 10 year workmanship guarantee

West Mersea is on an island, reached by the Strood, which floods on high spring tides. That single fact affects how work is scheduled here more than anything about the roofs.

The causeway

Rooflight and Skylight Installation in West Mersea on a Essex flat-roof extension
Rooflight and Skylight Installation in West Mersea on a Essex flat-roof extension

Deliveries of made to size units and scaffold have to be timed around the tide. It is not a problem, it is a planning matter, and we check the tide tables when scheduling rather than discovering it on the day. A crew stuck on the wrong side of the Strood is a wasted day for everybody.

Salt, at full strength

Slim-framed Rooflight and Skylight Installation in West Mersea fitted by Colchester specialists
Slim-framed Rooflight and Skylight Installation in West Mersea fitted by Colchester specialists

Surrounded by water on all sides. Marine grade powder coat and stainless fixings are the baseline here, not an upgrade, and standard architectural coatings will chalk within a few years.

We specify for the island rather than the catalogue, and it is the main reason a quotation here may differ from one for the same unit in Colchester.

Varied stock

Rooflight and Skylight Installation in West Mersea detail, glazing and watertight kerb
Rooflight and Skylight Installation in West Mersea detail, glazing and watertight kerb

Mersea has an unusual mix: old fishing cottages near the hard, inter-war and post-war housing, a lot of individually built and extended houses, and chalets. The roofs vary enormously and there is very little standard about them, so the survey does more work here than usual.

Where a house has been extended repeatedly, the flat roofs often date from different decades with different build ups, and a rooflight going into one needs the build up established rather than assumed.

Rooflight and skylight factors in West Mersea
Local factor In West Mersea
Planning authority Colchester City Council
Conservation position Conservation area around the old town and Coast Road
Typical roof covering Clay pantile and concrete interlocking
Roof structure Mixed
Exposure Fully exposed coastal. Marine grade coating is not optional
Most common job here Replacement to a marine specification
Local factors we check before quoting rather than after. The planning authority decides who you are dealing with, and the covering decides which flashing kit the job needs.

Skylight and rooflight work we cover in West Mersea

Interior view beneath a Rooflight and Skylight Installation in West Mersea in Colchester & Essex
Interior view beneath a Rooflight and Skylight Installation in West Mersea in Colchester & Essex

Roof lanterns, flat roof rooflights, roof windows, VELUX replacements, conservation units and sun tunnels, all surveyed before they are quoted. We also work in East Mersea, Peldon and Abberton.

Island roofs, and what the weather does to them

Rooflight and Skylight Installation in West Mersea installed across the Colne Valley
Rooflight and Skylight Installation in West Mersea installed across the Colne Valley

West Mersea sits at the end of the Strood on the most exposed inhabited ground we cover. Everything about specifying a rooflight here follows from that, and a unit chosen for a sheltered inland position is the wrong unit for this island.

Salt

Salt laden air is present here on most days of the year, and it attacks anything metallic. The practical answers are simple and they cost very little at the point of order.

Stainless steel fixings rather than plated ones. Plated fixings bleed rust down a roof within a few years here, and once they have failed a flashing is loose.

A durable factory finish on any exposed frame. Aluminium clad timber units suit this environment particularly well, because the cladding takes the weather and the timber stays dry behind it. On a steel conservation unit, check the powder coating every few years for damage, because exposed steel corrodes fast in this air.

Marine grade or high durability powder coating where a manufacturer offers it as an option. On a coastal property it is worth the small premium and it may be a condition of the warranty.

Driving rain and wind

What matters here is not how much rain falls but how it arrives. Wind driven water is pushed under a covering rather than running down it, and that puts almost the entire weathering job on two details.

The underlay collar, dressed and lapped so water reaching the membrane passes around the opening rather than into it. And the flashing kit, which must be the correct profile for the covering, correctly lapped, and generously sized. A universal kit that would be adequate in a sheltered position will let water past on Mersea within a couple of winters.

Wind loading is a genuine calculation here rather than an assumption from a catalogue, particularly on larger units and on anything that opens. An open sash is a sail, and the stay and the actuator have to hold it in gusts that inland properties never see.

A rain sensor on a motorised unit earns its keep here more than anywhere else we work. Weather arrives off the water quickly, and a window left open in a squall is a wet room and a stressed mechanism.

The building stock

Mixed and distinctive. There is older property around the Coast Road and the church, a great deal of twentieth century development, a significant number of former holiday chalets and bungalows that have been upgraded to permanent homes, and modern housing on the edges.

The chalets and bungalows are worth calling out. Many were built lightly, for summer use, and have been progressively insulated and improved since. Roof structures vary enormously and some are considerably lighter than a modern equivalent. On those, a survey establishes what the roof can carry before anything is specified, and a heavy unit such as a lantern may need structural work that would be unnecessary elsewhere.

They also offer something two storey housing does not: every room is under the roof, so daylight can go wherever it is needed, including internal bathrooms and hallways where a sun tunnel is the answer.

Condensation

More common here than inland. Coastal air is damp, older and lightly built properties run damp, and improvements to airtightness without a ventilation strategy trap the moisture inside.

Water forming evenly across the inner face of the glass on cold mornings is condensation, not a leak. It appears in winter, has nothing to do with rain, and clears as the day warms. No work on the window will fix it; ventilation will. An opening at the highest point of a room lets warm moist air leave and draws drier air in through anything open lower down.

Water forming on the plastered reveal rather than on the glass is different and usually is a fault, almost always a missing insulation collar. It is a separate order line, it is regularly omitted, and the symptom does not appear until the first cold spell.

Access and getting here

The Strood floods on the highest tides, and it is worth mentioning because it is the one genuinely unusual logistical fact about working on Mersea. We check tide times when planning a delivery of a large unit or a scaffold erection, which sounds fussy and prevents a wasted day.

Otherwise access is generally good. Most properties have off street parking and space to stand a tower, and a lot of the housing is single storey, which avoids scaffold entirely.

Permissions

There is a conservation area covering part of the older settlement and some listed buildings within it. A listing requires listed building consent for a rooflight on any slope regardless of visibility. In a conservation area, permitted development for rooflights survives unless an Article 4 direction removes it, which is worth confirming with the council.

Elsewhere on the island the ordinary permitted development rules apply: no more than 150mm projection beyond the plane of the roof, and not above the highest part of it.

What we fit on the island

Rooflight and Skylight Installation in West Mersea, specialist rooflight installation in Colchester
Rooflight and Skylight Installation in West Mersea, specialist rooflight installation in Colchester

Four kinds of job, and which one you have is usually obvious once the property type is established.

Roof windows into pitched slopes. The mainstay on the conventional twentieth century housing. Straightforward once cut or trussed is established, and specified for exposure rather than for a sheltered inland position.

Flat roof rooflights over extensions. Where the kerb decides everything: at least 150mm of upstand, the deck falling away from it, and rigid insulation on the outer face. On an exposed site the fall matters even more than usual, because standing water and driving rain together are what work a seal loose.

Sun tunnels. Particularly useful in the bungalows and chalets, where every room is under the roof and a windowless bathroom or hallway can be daylit for a fraction of the cost of anything else. The run is short, which is exactly the condition in which a rigid mirrored tube performs best.

Replacement. A large and growing share, because coastal exposure brings sealed units toward the shorter end of their fifteen to twenty five year life. Start with a photograph of the data plate rather than a tape measure.

What we would tell you not to do

Fit a very large single unit on an exposed south or west facing roof without solar control glass. It produces a room nobody uses in July and the fix afterwards costs nearly as much as the original installation.

Specify triple glazing as a default. It takes the whole unit U-value from about 1.2 to about 0.8, which is real and modest, while adding weight that affects an actuator, reducing daylight transmission, and costing substantially more. The same money on solar control glass, stainless fixings and an insulated kerb does more for how the room actually feels here.

Accept a universal flashing kit. On this island that is the single most consequential economy a quotation can make.

Timescales and getting materials here

Completed Rooflight and Skylight Installation in West Mersea project in Essex
Completed Rooflight and Skylight Installation in West Mersea project in Essex

A like for like replacement into a sound opening is a single day. A new opening with making good is three to four days. A sun tunnel is usually half a day.

The one genuinely unusual scheduling fact about working here is the Strood, which floods on the highest tides. We check tide times when planning a delivery of a large unit or a scaffold erection. It sounds fussy and it prevents a wasted day.

Beyond that, what lengthens a programme is the order rather than the work. Stock sizes are quick; made to measure units and lanterns run to several weeks. On the lighter built chalets and bungalows, a structural check on what the roof can carry may come first, and that is days rather than weeks.

Where consent is needed in the conservation area covering the older settlement, that is measured in months and it comes before the order.

Blinds and shading on the island

Rooflight and Skylight Installation in West Mersea bringing light into a north Essex property
Rooflight and Skylight Installation in West Mersea bringing light into a north Essex property

Worth deciding before the unit is ordered, because it affects which product to choose.

Mass market roof windows carry clip in blackout, pleated and venetian blinds that fit exactly and cost far less than made to measure. External awnings are also available and are far more effective against heat, because they intercept the sun outside the glass rather than after it has entered the room.

The caveat here is wind. An external blind on an exposed island roof needs to be robust, properly fixed, and ideally retractable automatically when the weather turns. On a solar powered unit a solar blind runs from its own panel, which avoids a second wiring question.

Where a blackout blind is wanted over a bedroom, order it with the window rather than retrofitting.

How we work

A survey before a fixed price, and on a lightly built chalet or bungalow that survey establishes what the roof can carry before anything is specified.

An itemised written quotation naming the product including coastal grade options, the flashing kit, the fixings and the insulation collar. Disposal of what comes out. A ten year guarantee on our workmanship alongside the manufacturer’s warranty on the product.

Where the work is notifiable we handle Building Control, and where consent is needed in the conservation area we prepare the material for the application. We also check tide times before booking a delivery, which sounds fussy and prevents a wasted day.

70
Towns and villages covered
30
Miles we travel from Colchester
10
Year workmanship guarantee
100%
Quotes given as a fixed written price
Common questions

Asked by people in West Mersea

Does the Strood affect scheduling?

More than anything else about a Mersea job. The causeway floods on high spring tides, so deliveries, scaffold and the crew are planned around the tide table. We check it before booking rather than turning up to a closed road.

How severe is the salt exposure?

Island exposure, so among the highest on our patch. Coastal grade coatings, compatible fixings, and the expectation that salt film on glass will need washing off more often than inland grime. It is not a place to accept a standard specification.

What is the housing stock like in West Mersea?

Mixed, from old cottages near the hard to considerable modern development. The older stock carries a conservation constraint in places; the newer generally does not.

Can you still work if a tide closes the road?

We plan around it rather than through it. That is why Mersea work is scheduled as full days on confirmed tides, and why we do not open a roof we cannot close before the causeway goes under.

Get your free quote

Ready to bring the daylight in?

Tell us about your project and we’ll send a clear, fixed written quote, no pressure, no surprises.

  • Fixed written price before any work starts
  • No pressure, no obligation, no sales calls
  • Flexible survey times that suit you
  • A reply within one working day
Prefer to talk? 01206 673276
Call Get a fixed quote